Akshar Electric Panel Board Pvt Ltd Abu Trip

AEPL bagged the complete SITC work for Plant’s HT & LT Electrification work including all statutory approvals. AEPL successfully... read more
WAGO is German Company and Exporter and OEM Manufacturer (Terminal Block and Connectors). AEPL bagged the complete SITC... read more
120/11KV 25MVA , transformer & system charged Successfully @ Somika 30K Lupoto, Lubumbashi. read more
L&T Ti business reached 500 crore and AEPB receives momento and appreciation as partner of L&T for being part of... read more
Akshar LeePANT also undertakes Detailed engineering work, Load flow engineering study, Relay co-ordination and power system analysis and provides read more
AEPL bagged the complete SITC work for substation and Transmission Line work. read more
ADANI GROUP teams visited our AEPB factory AEPB have developed this product as part of our CSR activity and... read more
AEPB have developed this product as part of our CSR activity and the product is part of our efforts... read more
AEPL bagged the complete Design, Engineering & SITC Electrical work for 2.0 GW Module area Entire Plant’s... read more

